H.A. McEwen (Bioler Repairs) Ltd

INDUSTRIAL BOILER PLANT INSTALLATION

Our wealth of experience means we can install boilers and ancillary equipment to suit clients’ requirements, whether a small skid-mounted boiler plant or a large multi-boiler installation.

The key considerations when installing a new industrial boiler installation are reliability and performance. Our modern industrial boiler solutions are designed, supplied and installed to maximise energy efficiency and reduce the carbon footprint at the site of installation.

CASE STUDY: INDUSTRIAL BOILERPLANT INSTALLATION
CLIENT: GLOBAL PETFOOD MANUFACTURER Case study
JOB: COMPLETE TURNKEY INSTALLATION OF TWO BYWORTH YSX6000 STEAM BOILERS

SCOPE OF WORK
After carrying out the maintenance on the existing boilerplant for over 15 years, when it came to upgrading to the latest in steam boiler technology we were ideally placed to offer sound advice from the very outset of this project through to its completion. We began by bringing in Byworth Boilers who we work closely with on projects such as this, as it was their steam boilers we were advocating using. The Byworth Yorkshireman 6000kgs/hr with integral economiser was the boiler of choice and we moved forward planning the whole project. Due the factory being a 24/7 operation we brought in a steam boiler hire unit which we ran new pipework too, this was done so in the future a temporary boiler can be connected up with ease in the future and reduces the factories risk of costly downtime, once this was in and commissioned we produced a work programme which would include us carrying out the following:

  • Remove existing Cochran steam boilers and original pipework
  • Deliver new Byworth YSX6000’s to site and site both within 8 hours shift.
  • Commence pipework installation to include new steam, condensate, water, gas, oil, safety valve exhausts, Blowdown lines etc.
  • Fabricate new lobster back chimney sections
  • Fabricate new access gantries to tie into boiler platforms
  • Commission new boilers and bring on-line
  • Remove temporary hire boiler.
Contact McEwen Boiler Repairs Ltd Industrial Boiler Installation
CASE STUDY: INDUSTRIAL BOILERPLANT INSTALLATION
CLIENT: MOORHOUSES BREWERY, BURNLEY Case study
JOB: INSTALLATION OF  4,400 LBS/HR GAS FIRED STEAM BOILERPLANT
SCOPE OF WORK
After the boiler was manufactured, along with the hotwell tank, blowdown receiver, manifolds etc, we delivered them to site, and began the on-site phase of the work. The hotwell and blowdown receiver were sited first at the back of the boilerhouse, as per the design, and then the boiler skated into position. Once sited our engineers began the pipework installation phase, which included on-site fabrication of the steam, gas and condensate lines, as well as the installation of the feed, blowdown and exhausts to and from the boiler. A crane was brought to site for the work at height, which included installing the aluminium chimney sections and roof sealing cowls. The boiler was finally commissioned and handed over the Moorhouses staff.

Contact McEwen Boiler Repairs Ltd Industrial Boiler Installation

For more information about our range of industrial boiler services, select a link below:

Heritage Steam Boiler
GET IN TOUCH

When it comes to service, quality and safety, our record speaks for itself. We are competitively priced without any compromise on quality. To find out how we could help, please contact us:

ENQUIRY FORM

BY EMAIL

01535 634674

RECENT NEWS
A Year in the Life of a Boilermaker: It's been a busy 2013. Read More...

Feeling Hotwell: Our new Hotwell Tanks have proved a hit. Read More...

Efficient Steam Boilers: Powering production at food company. Read More...